Black Friday Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Good News !!! CTAL-TAE ISTQB Certified Tester Advanced Level, Test Automation Engineering is now Stable and With Pass Result

CTAL-TAE Practice Exam Questions and Answers

ISTQB Certified Tester Advanced Level, Test Automation Engineering

Last Update 5 days ago
Total Questions : 40

ISTQB Certified Tester Advanced Level, Test Automation Engineering is stable now with all latest exam questions are added 5 days ago. Incorporating CTAL-TAE practice exam questions into your study plan is more than just a preparation strategy.

CTAL-TAE exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through CTAL-TAE dumps allows you to practice pacing yourself, ensuring that you can complete all ISTQB Certified Tester Advanced Level, Test Automation Engineering practice test within the allotted time frame.

CTAL-TAE PDF

$43.75
$124.99

CTAL-TAE Testing Engine

$50.75
$144.99

CTAL-TAE PDF + Testing Engine

$63.7
$181.99
Question # 1

Which of the following statement about the implementation of automated regression testing is FALSE?

Options:

A.  

When automating regression tests, the structure of automated tests mustalways be the same as the corresponding manual tests

B.  

When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly

C.  

When automating regression tests, theinitialization steps set the test preconditions should be automated wherever possible

D.  

When automating regression tests, consideration should be given to how much time would be saved by automation

Discussion 0
Question # 2

As a TAE you are evaluating a functional test automation tool that will be for several projects within yourorganization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.

Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?

  • Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
  • Does the test automation tool support a licensing scheme that allows accessing different sets?
  • Does the testautomation tool have a large feature set, but only part of the features will be sets?
  • Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?

Does the test automation tool need to install specific libraries that could impact the SUT?

Options:

A.  

A and C

B.  

A and E

C.  

B and E

D.  

C and D

Discussion 0
Question # 3

A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.

Which of the following would be the BEST way to automatically provides this report?

Options:

A.  

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.

B.  

Store the execution result of theintegration tests for the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team

C.  

Store the execution results of the integration testsfor the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team

D.  

Store the code coverage results of the integration testsfor the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Discussion 0
Question # 4

Which of the following statements does NOT describe good practice for maintaining the TAS?

Options:

A.  

The TAS must run in the development environment because development and programming knowledge are required for its maintainability

B.  

The TAS must be under configuration management, along with the test suite, the testware artefacts and the test environment in which it runs

C.  

The TAS must separate the test scripts fromthe environment in which it runs and from the associated harnesses and artefacts

D.  

The TAS must consist of components that can be easily replaced without affecting the overall behavior of the TAS itself

Discussion 0
Question # 5

A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).

What could be the MOST problematic for this TAS?

Options:

A.  

Maturity of the test process

B.  

Complexity to automate

C.  

Frequency of use

D.  

Sustainability of the automated environment

Discussion 0
Question # 6

A SUT has an existing automated test suite.

Which of the following statements relating to the introduction of new features in the SUT is TRUE?

Options:

A.  

Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort

B.  

The introduction of a new feature could require updates or additions to the testware components

C.  

The test automation engineer should work with the business analysts to ensure the new feature is testable

D.  

It is generally more difficult to automate test cases for a new feature as the development has not yet started

Discussion 0
Get CTAL-TAE dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |