Summer Sale - Special Limited Time 55% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 44314956B5

Good News !!! CTAL-TTA Certified Tester Advanced Level Technical Test Analyst is now Stable and With Pass Result

CTAL-TTA Practice Exam Questions and Answers

Certified Tester Advanced Level Technical Test Analyst

Last Update 4 days ago
Total Questions : 129

Certified Tester Advanced Level Technical Test Analyst is stable now with all latest exam questions are added 4 days ago. Incorporating CTAL-TTA practice exam questions into your study plan is more than just a preparation strategy.

CTAL-TTA exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through CTAL-TTA dumps allows you to practice pacing yourself, ensuring that you can complete all Certified Tester Advanced Level Technical Test Analyst practice test within the allotted time frame.

CTAL-TTA PDF

$54
$119.99

CTAL-TTA Testing Engine

$63
$139.99

CTAL-TTA PDF + Testing Engine

$79.65
$176.99
Question # 1

Below is the pseudo-code for the bingo program:

The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?

Options:

A.  

Variable "MIN" is not assigned a value before using it.

B.  

Variable "AB is defined but subsequently not used.

C.  

An invalid value is assigned to variable "B".

D.  

The hard-coded value '2" should not be used.

Discussion 0
Question # 2

The F in the mnemonic FIRST stands for Fast Which option correctly states the meanings of the other four letters (IRST)?

SELECT ONE OPTION

Options:

A.  

isolated, Reliable. Self-Verifying, Timely.

B.  

Independent, Reliable, Self-Validating, Timely

C.  

independent. Repeatable, Self-Verifying, Thorough.

D.  

Isolated. Repeatable. Self-Validating, Thorough.

Discussion 0
Question # 3

You are conducting security tests on an e-commerce application. Many core areas have been tested and found to have no issues. Protection of users' private information has also been verified. You are now focusing on testing the UI, which captures query information from the user. Which of the following defect types should you target in your testing?

Options:

A.  

Subsystem failures after prolonged stress

B.  

Inaccurate user messages

C.  

Buffer overflow

D.  

Slow down in performance

Discussion 0
Question # 4

Which of the following statements is true regarding API and GUI testing?

Options:

A.  

API testing usually tests Individual inputs rather than combinations whereas GUI testing usually tests combinations

B.  

In a service-oriented architecture. GUI testing is more important because of the need to verify the service supplied to the user

C.  

Negative testing is used primarily with GUI testing

D.  

API testing usually requires the use of tools, whereas GUI testing usually does not

Discussion 0
Question # 5

What is the common name for a type of automated testing technique that separates test input data and expected test results from the control script used to execute all of the tests?

Options:

A.  

Data-based testing

B.  

Keyword-driven testing

C.  

Model-driven testing

D.  

Behavior-based testing

Discussion 0
Question # 6

You are defining the test approach for an Agile project release focused on significantly overhauling the user interface of a golf club's booking system. Additional features will allow more flexible bookings across three courses. These changes are driven by numerous customer complaints about the current system's confusing design and limited options. The release will consist of six two-week sprints.

Stakeholders have performed a risk assessment and consider the impact of system failure as high due to potential customer loss. A regression-averse strategy is recommended due to the extensive changes expected in screen design and functionality.

Which option below represents the BEST test approach for this release? Please use the following symbols consistently:

  • ♦+ (highly recommended)
  • ♦ (recommended)
  • o (neutral/optional)
  • • (not recommended)
  • - (not to be used)

SELECT ONE OPTION

Options:

A.  

3

B.  

1

C.  

4

D.  

2

Discussion 0
Question # 7

You are working on a project that is integrating code from multiple development groups. There have been numerous integration problems, particularly regarding reliability, error recovery and transactional integrity. You are now responsible for planning the performance efficiency testing for this product. There Is a strong feeling among the development managers that some parts of the code are weaker than others and will tend to exhibit problems during the performance efficiency testing. To identify these problematic areas as soon as possible, which type of testing should you do?

Options:

A.  

Load testing

B.  

Interoperability testing

C.  

Stress testing

D.  

Scalability testing

Discussion 0
Question # 8

Your team is now accountable for the support and enhancement of a payroll system that has been in production for many years and modified by many different developers. It has been noticed by management that small functional enhancements take much longer than equivalent changes on more recently developed systems. You have been tasked with implementing improved testing approaches that will help to identify the root cause of this problem.

Which of the following is the best technique to apply in this scenario?

Options:

A.  

Orthogonal arrays

B.  

Exploratory analysis

C.  

Static analysis

D.  

Data flow analysis

Discussion 0
Question # 9

You are ar teviemng the fdbwng Java furxton that deteimates whether a curb*. rput by the user. * Even or Odd Public da»s Oddorfven {

public state void mair^Strcg [ | args) (

Scarcer read - new ScanrerfSystem inje

System out prim (’Pease enter a rxmber'i;

int Number • reader nextfntO,

if(Number^2»»0)

System out prrrtln "your input number 'Number ♦ * is even ).

else

System out prntirfyour input number 'Number ♦ * is odd*);

)

}

You are Qj>ded by ’.he following checklist

•All variables must start with a Capital letter

•All output messages must start with a Capita letter

•There must De a comment bne e« pla ning the purpose of the dess

How many checklist items Mve been fuelled7

SELECT ONE OPTION

Options:

A.  

3

B.  

None

C.  

1

D.  

2

Discussion 0
Question # 10

Your Agile team is developing a web-based system that will allow users to browse and buy online from a store's shopping catalogue. Continuous Integration has been implemented and technically it is working well, running several times per day, but each run is taking almost as much time as the team is prepared to allow. It is clear that after a few more iterations, as the number of tests needed grows with the product, it will be taking too much time.

Which of the four options contains a pair of solutions that will BOTH help to solve this problem?

a.Only include unit and component integration tests in the automated Cl runs.

b.Schedule low priority tests to be the first ones executed in each run, in order to provide rapid build verification.

c.Reduce the extent to which the automated tests go through the user interface, using technical interfaces instead.

d.Reduce the number of Cl cycles run each day.

e.Select a subset of automated tests for the daytime Cl runs, and run as many of the other tests as possible in an overnight cycle.

SELECT ONE OPTION

Options:

A.  

d and e

B.  

b and d

C.  

c and e

D.  

a and c

Discussion 0
Get CTAL-TTA dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |