Special Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Good News !!! LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result

LEED-AP-BD+C Practice Exam Questions and Answers

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 weeks ago
Total Questions : 337

LEED AP Building Design + Construction (LEED AP BD+C) is stable now with all latest exam questions are added 2 weeks ago. Incorporating LEED-AP-BD+C practice exam questions into your study plan is more than just a preparation strategy.

LEED-AP-BD+C exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through LEED-AP-BD+C dumps allows you to practice pacing yourself, ensuring that you can complete all LEED AP Building Design + Construction (LEED AP BD+C) practice test within the allotted time frame.

LEED-AP-BD+C PDF

$43.75
$124.99

LEED-AP-BD+C Testing Engine

$50.75
$144.99

LEED-AP-BD+C PDF + Testing Engine

$63.7
$181.99
Question # 1

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.  

Verify installation and performance of the commissioned systems

B.  

Review the building 10 months after substantial completion

C.  

Verify that training requirements are completed

D.  

Develop a systems manual for the commissioned systems

Discussion 0
Question # 2

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.  

Take appropriate measures for the safe collection, storage and disposal of batteries

B.  

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.  

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.  

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Discussion 0
Question # 3

Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?

Options:

A.  

Materials and resources

B.  

Location and site selection

C.  

Regional priority and innovation

D.  

Energy and water related systems

Discussion 0
Question # 4

What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

Options:

A.  

Design

B.  

Discovery

C.  

Operations

D.  

Construction

Discussion 0
Question # 5

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

Options:

A.  

The ESC plan cannot be modified during the design phase of the LEED certification

B.  

The ESC plan can be developed or modified during the design phase of LEED certification

C.  

A compliant ESC plan may be developed during construction

D.  

A compliant ESC plan must be in place when the commissioning authority is appointed

Discussion 0
Question # 6

What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

Options:

A.  

Quality

B.  

Quantity

C.  

Efficiency

D.  

Performance

Discussion 0
Question # 7

What information must be provided to demonstrate compliance with the Owner’s Project Requirements (OPR)?

Options:

A.  

Preliminary data collection

B.  

Basis of Design (BOD)

C.  

Design charrette plan

D.  

Renewable Energy Certificates (RECs)

Discussion 0
Question # 8

Where must a building's no-smoking signage be posted?

Options:

A.  

Within 10 ft. (3 m) of all building entrances

B.  

Within 10 ft. (3 m) of the main building entrance(s)

C.  

Within 25 ft. (8 m) of all building entrances

D.  

Within 25 ft. (8 m) of the main building entrance(s)

Discussion 0
Question # 9

In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

Options:

A.  

Zero

B.  

One

C.  

Two

D.  

Three

Discussion 0
Question # 10

A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?

Options:

A.  

Building operating schedule and occupancy hours

B.  

Building operating schedule and total window area

C.  

Building envelope construction and occupancy hours

D.  

Total window area and building envelope construction

Discussion 0
Get LEED-AP-BD+C dumps and pass your exam in 24 hours!

Free Exams Sample Questions

sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |