- Mar 3, 2017
- 1,687
- 6,243
- 136
Wonder how many wheels will be created in 5 yearsNice, jumping straight to number 300 so they can change the numbering scheme again in just 5 years.
Canonically, 365 should be based off a new version of the same architecture, while 370 should be a rebadge of a previously successful product. I wonder how and why do they do such rebrands, it's already very confusing with their wheels of doom and whatnotSo Ryzen AI 9 HX 370 and Ryzen AI 9 365 are allegedly the updated names for Strix Point, and of course still no leaked serious benchmarks 10 days before some disclosure...
AMD Ryzen AI 9 HX 370: Strix Point tritt mit Namen im Intel-Core-Ultra-Stil plus AI an
Die Drehscheibe war gestern, im Notebook setzt AMD mit Strix Point schon wieder auf eine neues Schema: Mit AI und Core-Ultra-Anleihen.www.computerbase.de
There's no canon lolCanonically, 365 should be based off a new version of the same architecture, while 370 should be a rebadge of a previously successful product. I wonder how and why do they do such rebrands, it's already very confusing with their wheels of doom and whatnot
There is no logic or reason, AMD marketing just makes stuff up as they go.Canonically, 365 should be based off a new version of the same architecture, while 370 should be a rebadge of a previously successful product. I wonder how and why do they do such rebrands, it's already very confusing with their wheels of doom and whatnot
The kings of the trolls suggested something to AMD to be sure to be ahead in numbers, and it s right that you cant beat WCCF Tech when it comes to troll your way in the business...Yeah the reasoing was particularily odd (from the same computerbase article, translated):
Some of you previously said ... " 'Strix Halo' will be pretty expensive ... " ... ... OK, then ... ... Apple's M4 will also be pretty expensive, but built over N3E ... since 'Halo' is going to be such expensive it would have been great to be manufactured on N3E node too ...
Yes, but time to market is key, and N3E just came out (and only on ipad lol). If N3E was delayd for some reason, Strix Halo would be delayed too.
Yeah really weird. The weeks leading the radeon VII launch was very similar.So Ryzen AI 9 HX 370 and Ryzen AI 9 365 are allegedly the updated names for Strix Point, and of course still no leaked serious benchmarks 10 days before some disclosure...
AMD Ryzen AI 9 HX 370: Strix Point tritt mit Namen im Intel-Core-Ultra-Stil plus AI an
Die Drehscheibe war gestern, im Notebook setzt AMD mit Strix Point schon wieder auf eine neues Schema: Mit AI und Core-Ultra-Anleihen.www.computerbase.de
ah, those idiots... Always renaming old USB to the new one just for the sake of $ and confusion.It's still better than whatever the USB Implementer Forum is doing...
The microarchitecture is more important than the node.It would be a pity ... AMD has already overtaken Intel ... and it would be a really interesting challenge to see if AMD is also capable of surpassing Apple ... in the field of energy efficiency; and in the field of efficiency, the manufacturing node is a key factor
Because it is a check mark feature, that will have little impact on sales.Kraken Point, Strix Point, Strix Halo
All three Zen5 mobile parts, from the lowest end to the highest end, will have a ~50 TOPS NPU. This is interesting. The NPU does not scale up in size/performance for the higher end parts, like CPU/GPU does. Why not?
Will it remain this way for future generations too?
Microsoft requirementKraken Point, Strix Point, Strix Halo
All three Zen5 mobile parts, from the lowest end to the highest end, will have a ~50 TOPS NPU. This is interesting. The NPU does not scale up in size/performance for the higher end parts, like CPU/GPU does. Why not?
Will it remain this way for future generations too?
Or use your brian (the original I)And beyond the fact that it's just an MS requirement, AMD's interest would rather be to play the same card as NV: "you want REAL AI? Buy a Radeon card".
Or use your brian (the original I)
If NPU is a tax, you pay the minimum necessary tax.Kraken Point, Strix Point, Strix Halo
All three Zen5 mobile parts, from the lowest end to the highest end, will have a ~50 TOPS NPU. This is interesting. The NPU does not scale up in size/performance for the higher end parts, like CPU/GPU does. Why not?
Will it remain this way for future generations too?
Once they realise that people are not willing to pay $20/month for co-pilot plus and similar AI services I wonder how important they will be.If NPU is a tax, you pay the minimum necessary tax.