Technically not an item, but recently did a purchase which totaled to $10,994.60.
Got a road built and a section of land cleared. I did buy a culvert, so guess that counts as an item I bought.
$8,650 for the land clearing and culvert, and $2,344.60 for 3 gravel loads.
The best part of all this is I stayed more or less within my 10k budget, it took 4 days instead of the original 2 I planed for but there was a lot of extra work that I did not anticipate in the original plan, but it just made sense to do it while they had the equipment out there. The ground was very rocky which made it difficult to flatten it as is or to even dig much, so had to bring in material from another part of the property that was not as rocky. I kinda got lucky that material was there and easily accessible. They must have moved like 50 dump trailer loads of it so that would have cost a lot if I had to buy it.
Due to the ground the outhouse and especially septic is going to be a challenge though, but I will figure that out at another time. There are options for doing a raised septic system and can do a compost outhouse as a temp measure.
View attachment 101648