fresh home build coming soon

Page 16 - Seeking answers? Join the AnandTech community: where nearly half-a-million members share solutions and discuss the latest tech.

skyking

Lifer
Nov 21, 2001
22,453
5,468
146
When I got this plan going, I set a goal of not having any ducts or BS dangling below the floor system. What a PITA that has been! I've been learning sheetmetal along the way and did a 4" panel reducer on this bend, which required cutting the long way bend. I wanted stuff that just plugged together. No, Not so much.


That long run of holes is filled up now.


Not a fancy elegant reducer, just a dirty old end cap transition to 8" round. I will cut in a 6" to 3.25x14 wall riser near that area to get up to the sunroom on the 2nd floor. It is a bit locked in from other routes so I figured out a shortcut.

 
Last edited:
Reactions: iRONic

Micrornd

Golden Member
Mar 2, 2013
1,314
192
106
49 years in construction and I still enjoy the hell out of seeing tradesmen that actually know what they are doing and do quality work.
 
Reactions: iRONic

Greenman

Lifer
Oct 15, 1999
21,194
5,747
136
Any reason you used the TJI over open truss style beams? I wonder if that would have made the hvac easier.
Because TJ's are readily available, span and load information is published and accepted by pretty much every building official, they're inexpensive, light and easy to handle, and you can hack massive holes through them. The question should be, why would anyone use anything else?
 

skyking

Lifer
Nov 21, 2001
22,453
5,468
146
^ pretty much all of that.
Looking back, I would have been better off with 14¨s
I did 11 7/8" because it covered all the bases, but the added material cost going to 14" might have been $2500.
That is such a nothingburger in the whole scheme of things.
The guys were putting down subfloor and I was putting rail around the stairwell and covering the shaft for safety. I set it back 7/16"from the edge of the hole so we can frame those walls and leave the railings in place.
I did not want a scenario where the railing had to be removed and then you are working at an open hole again.



The floor feels great! all of this is where I put in the enhanced I-joists, and it is quiet and solid already, without the sheetrock below.
 
Reactions: iRONic
sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |