Ok...I say again. Watch the depth on the 7k. I had one gig where I put in 7018s (WHY cisco? WHY side to side air flow?) and had to redo everything because they simply didn't have the space for them. We're talking 20+ full rows.
No way they could fit them because of the depth. Had to rip out some racks and make space specifically for 7k, reroute a lot of cable etc. That's where the whole top of rack/end of row REALLY comes in handy. Core cabling is easy if you do that.
Back to your OP - you use high bandwidth 50 micron, laser optimized (OM3, OM4) MM fiber in the data center for 10 gig, twinax for short runs if you can get away with it ie host connections.
I measured where we they are going and it looks like to me we will be ok. However we ordered one of the Chassis last month ahead of time(extra budget that month since we under spent on something else) and it has been sitting in the warehouse. I talked to my boss about it today and we are going to bring up that chassis next week and see how it looks in the rack. This way if we have any issues we can go ahead and correct it before the bulk of the equipment comes in towards October. I do appreciate the heads up.