Hi, I have a portable generator (it's large enough to power the entire house) and had an electrician install a 30amp generator connection to the outside of my home. From there the lines rights to an existing mechanical transfer switch. Position down is for the power company and position up is for the generator.
I want to make sure that the order of connection here is correct:
Power Is Out
I want to make sure that the order of connection here is correct:
Power Is Out
- Plug the cord into generator and then to house
- Power on the generator, let it warm up
- Set the Transfer Switch to generator
- Turn Transfer Switch to Generator
- Turn Transfer Switch to Power Co
- Disconnect the generator cable
- Power down generator