Hurry up Intel

Dec 12, 2004
29
0
0
Intel hurry up and get these Conroe chips onto the market, because im dying here with this P3 600 in front of me. Everytime i plan to upgrade, something better comes along, and i wait, then i dont end up upgrading. This time i have money to splash, and im getting anxious to bye something. It better be worth the wait.
 

Viditor

Diamond Member
Oct 25, 1999
3,290
0
0
Originally posted by: btpenterprises
Intel hurry up and get these Conroe chips onto the market, because im dying here with this P3 600 in front of me. Everytime i plan to upgrade, something better comes along, and i wait, then i dont end up upgrading. This time i have money to splash, and im getting anxious to bye something. It better be worth the wait.

Ouch...kinda reminds me of a gambling addict (with respect).
Something better will ALWAYS be coming along! Conroe should be available in retail by September or so (though you might be able to get one sooner if you want to pay the premium...).
 

the Chase

Golden Member
Sep 22, 2005
1,403
0
0
Intel hardly even needs to "launch" Conroe CPU's, they are trickling out all over the place. Some dude just got ahold of 300 of them (and posted pics to prove it) which he says are the final production revision. Keep your eyes on Ebay if you really must have one quick and are willing to pay a premium.
 

secretanchitman

Diamond Member
Apr 11, 2001
9,352
23
91
Originally posted by: the Chase
Intel hardly even needs to "launch" Conroe CPU's, they are trickling out all over the place. Some dude just got ahold of 300 of them (and posted pics to prove it) which he says are the final production revision. Keep your eyes on Ebay if you really must have one quick and are willing to pay a premium.

lol really? i wanna see that picture...lucky duck. i wonder how he got so many of them??
 

IsDanReally

Member
Nov 19, 2002
54
0
0
I just did a quick check of a vendor found on froogle...

CORE 2 DUO E6600 DC LGA775 2.4G 4MB EM64T HT 65NM 1066MHZ BOX
Warehouse, Available, Incoming, ETA
California, Southern 0 1620 07-05-2006

$343

Hardly seems like any extreme pricing or anything. They even let you place you order if you want

Edit:
Total In Stock: Total Back Ordered: Total Incoming:
0 6 3040
 

VivienM

Senior member
Jun 26, 2001
486
45
91
Originally posted by: btpenterprises
Intel hurry up and get these Conroe chips onto the market, because im dying here with this P3 600 in front of me. Everytime i plan to upgrade, something better comes along, and i wait, then i dont end up upgrading. This time i have money to splash, and im getting anxious to bye something. It better be worth the wait.

P3 600? Wow... you need a Conroe even more badly than I do... (my Conroe will be replacing a 1.9 Willamette...)
 

Viditor

Diamond Member
Oct 25, 1999
3,290
0
0
Originally posted by: IsDanReally
I just did a quick check of a vendor found on froogle...

CORE 2 DUO E6600 DC LGA775 2.4G 4MB EM64T HT 65NM 1066MHZ BOX
Warehouse, Available, Incoming, ETA
California, Southern 0 1620 07-05-2006

$343

Hardly seems like any extreme pricing or anything. They even let you place you order if you want

Edit:
Total In Stock: Total Back Ordered: Total Incoming:
0 6 3040

If you read the fine print, many places are actually allowed to change the pricing once the parts are shipping (even if you have prepaid). They refund your money and then sell you the same thing for more money (they get away with it by changing their internal SKU).
If you could provide a link, maybe we could all take a look and see what they are offering?
 

Viditor

Diamond Member
Oct 25, 1999
3,290
0
0
Originally posted by: IsDanReally
Since at the moment I'm not up to reading fine print...

http://www.shopblt.com/cgi-bin/shop/sho...=011003000509_BK12401P.shtml&ORDER_ID=!ORDERID!

The "Order As Needed" box is why they will take your money now...the part can take as long as it takes (i.e. 6 months from now) for receipt in that price range, with no timeframe guarantee.

Edit: To be a little clearer, I expect that Intel will be shipping ~200k Conroes at launch, and the number will increase every month. After Dell, HP, etc... get their priority allotments, there should be ~10k chips left to be spread among all of the retailers. So if a retailer has an order in for 1000 chips (fairly modest order), they will most likely get 20-30 chips the first month, maybe 40-50 the second month, etc...
The common practice among retailers is to sell the small allotment they get for much higher prices as a special promotion chip, usually for ~20-40% higher than MSRP, until they start to get shipments at the 50% level or higher...
 

IsDanReally

Member
Nov 19, 2002
54
0
0
Makes sense, but just to see how it works out I've placed my order. If they raise the price they don't get my order...if it's delayed, I have the chance to order elsewhere, and if their face value claim works out, I get a nice computer built sooner rather than later.

I'll be sure to let everyone know how it works out though.
 

The I

Member
Aug 6, 2005
26
0
0
Originally posted by: btpenterprises
Intel hurry up and get these Conroe chips onto the market, because im dying here with this P3 600 in front of me. Everytime i plan to upgrade, something better comes along, and i wait, then i dont end up upgrading. This time i have money to splash, and im getting anxious to bye something. It better be worth the wait.

Wauv! I thought I was patient waiting to upgrade my P4 2,0 ghz nw! Already pushed the new build at least 3 times... guess that's a lesson to prove that I should get something done about it soon...
 

Viditor

Diamond Member
Oct 25, 1999
3,290
0
0
Originally posted by: IsDanReally
Makes sense, but just to see how it works out I've placed my order. If they raise the price they don't get my order...if it's delayed, I have the chance to order elsewhere, and if their face value claim works out, I get a nice computer built sooner rather than later.

I'll be sure to let everyone know how it works out though.

Thanks! That'll be good input, mate...
 

the Chase

Golden Member
Sep 22, 2005
1,403
0
0
Originally posted by: Viditor
Originally posted by: IsDanReally
Since at the moment I'm not up to reading fine print...

http://www.shopblt.com/cgi-bin/shop/sho...=011003000509_BK12401P.shtml&ORDER_ID=!ORDERID!

The "Order As Needed" box is why they will take your money now...the part can take as long as it takes (i.e. 6 months from now) for receipt in that price range, with no timeframe guarantee.

Edit: To be a little clearer, I expect that Intel will be shipping ~200k Conroes at launch, and the number will increase every month. After Dell, HP, etc... get their priority allotments, there should be ~10k chips left to be spread among all of the retailers. So if a retailer has an order in for 1000 chips (fairly modest order), they will most likely get 20-30 chips the first month, maybe 40-50 the second month, etc...
The common practice among retailers is to sell the small allotment they get for much higher prices as a special promotion chip, usually for ~20-40% higher than MSRP, until they start to get shipments at the 50% level or higher...

Uhggg. If it works out like that scenerio that won't be pretty...
 

Viditor

Diamond Member
Oct 25, 1999
3,290
0
0
Originally posted by: the Chase
Originally posted by: Viditor
Originally posted by: IsDanReally
Since at the moment I'm not up to reading fine print...

http://www.shopblt.com/cgi-bin/shop/sho...=011003000509_BK12401P.shtml&ORDER_ID=!ORDERID!

The "Order As Needed" box is why they will take your money now...the part can take as long as it takes (i.e. 6 months from now) for receipt in that price range, with no timeframe guarantee.

Edit: To be a little clearer, I expect that Intel will be shipping ~200k Conroes at launch, and the number will increase every month. After Dell, HP, etc... get their priority allotments, there should be ~10k chips left to be spread among all of the retailers. So if a retailer has an order in for 1000 chips (fairly modest order), they will most likely get 20-30 chips the first month, maybe 40-50 the second month, etc...
The common practice among retailers is to sell the small allotment they get for much higher prices as a special promotion chip, usually for ~20-40% higher than MSRP, until they start to get shipments at the 50% level or higher...

Uhggg. If it works out like that scenerio that won't be pretty...

It's not that bad...it's just a question of time. Early adopters ALWAYS pay more...
By Octoberor so it should be close to sorted out...
 

thegimp03

Diamond Member
Jul 5, 2004
7,420
2
81
Well, it appears you have waited since about 1998/1999/2000 with that P3 600. What's a couple of more months?

From the Conroe benchmarks I've seen so far I've been impressed.
 

Looney

Lifer
Jun 13, 2000
21,938
5
0
Originally posted by: btpenterprises
Intel hurry up and get these Conroe chips onto the market, because im dying here with this P3 600 in front of me. Everytime i plan to upgrade, something better comes along, and i wait, then i dont end up upgrading. This time i have money to splash, and im getting anxious to bye something. It better be worth the wait.

Yikes, and i thought i had it bad when i gave my 2500XP to my brother. Currently my server is running on an old Athlon 1500... it's functional with Windows MCE, but i need an upgrade asap so i can start running Vista on it.

I'm like you though, i'm holding off for Conroe. If prices come down on ebay more, i may just pick one up from there instead.
 
sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |