stupid renovation took much longer than it should have. Haven't had a working kitchen since the 1st of July. was supposed to be done in September, its now basically all done. Really just have to do the crown molding and kick plates for the cabinets now. The hold up was the cabinets, Hand made by a Mennonite dude, took forever but cost 1/3 of what the kitchen design place wanted for the same thing.
Gutted and removed everything, totally changed the layout of the kitchen, all new appliances (minus fridge it was new already),new counter top and cabinets, new heating, closed off a door way, punched a hole in a wall to make a new door, built an airlock, large deck extension
full gallery here
http://www.rootminus1.com/admin/kitchen/index.html
Here are a few before and afters,
BEFORE
AFTER
Gutted and removed everything, totally changed the layout of the kitchen, all new appliances (minus fridge it was new already),new counter top and cabinets, new heating, closed off a door way, punched a hole in a wall to make a new door, built an airlock, large deck extension
full gallery here
http://www.rootminus1.com/admin/kitchen/index.html
Here are a few before and afters,
BEFORE
AFTER
Last edited: