Discussion Intel Meteor, Arrow, Lunar & Panther Lakes Discussion Threads

Page 52 - Seeking answers? Join the AnandTech community: where nearly half-a-million members share solutions and discuss the latest tech.

Tigerick

Senior member
Apr 1, 2022
686
576
106






As Hot Chips 34 starting this week, Intel will unveil technical information of upcoming Meteor Lake (MTL) and Arrow Lake (ARL), new generation platform after Raptor Lake. Both MTL and ARL represent new direction which Intel will move to multiple chiplets and combine as one SoC platform.

MTL also represents new compute tile that based on Intel 4 process which is based on EUV lithography, a first from Intel. Intel expects to ship MTL mobile SoC in 2023.

ARL will come after MTL so Intel should be shipping it in 2024, that is what Intel roadmap is telling us. ARL compute tile will be manufactured by Intel 20A process, a first from Intel to use GAA transistors called RibbonFET.



Comparison of upcoming Intel's U-series CPU: Core Ultra 100U, Lunar Lake and Panther Lake

ModelCode-NameDateTDPNodeTilesMain TileCPULP E-CoreLLCGPUXe-cores
Core Ultra 100UMeteor LakeQ4 202315 - 57 WIntel 4 + N5 + N64tCPU2P + 8E212 MBIntel Graphics4
?Lunar LakeQ4 202417 - 30 WN3B + N62CPU + GPU & IMC4P + 4E08 MBArc8
?Panther LakeQ1 2026 ??Intel 18A + N3E3CPU + MC4P + 8E4?Arc12



Comparison of die size of Each Tile of Meteor Lake, Arrow Lake, Lunar Lake and Panther Lake

Meteor LakeArrow Lake (20A)Arrow Lake (N3B)Arrow Lake Refresh (N3B)Lunar LakePanther Lake
PlatformMobile H/U OnlyDesktop OnlyDesktop & Mobile H&HXDesktop OnlyMobile U OnlyMobile H
Process NodeIntel 4Intel 20ATSMC N3BTSMC N3BTSMC N3BIntel 18A
DateQ4 2023Q1 2025 ?Desktop-Q4-2024
H&HX-Q1-2025
Q4 2025 ?Q4 2024Q1 2026 ?
Full Die6P + 8P6P + 8E ?8P + 16E8P + 32E4P + 4E4P + 8E
LLC24 MB24 MB ?36 MB ??8 MB?
tCPU66.48
tGPU44.45
SoC96.77
IOE44.45
Total252.15



Intel Core Ultra 100 - Meteor Lake



As mentioned by Tomshardware, TSMC will manufacture the I/O, SoC, and GPU tiles. That means Intel will manufacture only the CPU and Foveros tiles. (Notably, Intel calls the I/O tile an 'I/O Expander,' hence the IOE moniker.)

 

Attachments

  • PantherLake.png
    283.5 KB · Views: 23,983
  • LNL.png
    881.8 KB · Views: 25,455
Last edited:

A///

Diamond Member
Feb 24, 2017
4,352
3,155
136
Buy two 7950X3D's, the other one with the cheapest mobo you can find and you could do the same amount of encoding work (maybe more) than those crappy hot Intels. I have a 12700K and I wouldn't encode on it for too long. It just gets too hot for comfort. Not to mention inefficient. Sell or donate your Intel PCs.
Most likely the viable solution. The 13900K are significantly better but as I said they run hotter and restraining them to 253 watts is level with AMD, the cache won't do much for software encodes but there's small benefits to the amd platform. I can get away by running larger ram kits at reduced speed. I don't know if I'll donate them but I'm sure I can find a use for them eventually if not sell them to someone for cheap. I got them dirt cheap through combo deals online. I'm expecting AMD to move head first into ai/neural and inferencing with zen 5 and beyond as Intel plans to do the same.
 

A///

Diamond Member
Feb 24, 2017
4,352
3,155
136
Sure about that?


7950X3D close to 7950X at just 151W. The cache is doing SOMETHING.
????

save 52 watts and lose roughly 4 frames processing power? That's it? I'd be impressed if the 3d can shave off minutes of encoding time per file. Or in my case, a few hours off each batch.
 
Reactions: Joe NYC

Tigerick

Senior member
Apr 1, 2022
686
576
106
Hmm, LNL supposedly should scale down from 15W TDP to 9-12W in order to support fanless design. Especially with 442 max config, there is no chance to fight with ARL-P with 683 config...
 

Exist50

Platinum Member
Aug 18, 2016
2,452
3,101
136
The foundation of lowering system power comes with Meteorlake. The issue is that the PCH cannot power down fast enough in realistic scenarios, since even in Icelake it can reach ultra low standby power. What's the point of super low standby if it can only be reached literally after 2 mins of doing absolutely nothing, not even moving a mouse pointer?

This problem has been "known" for a decade now. I think if they did not screw up royally on the 10nm generation, we would have seen it quite a bit before 2020.

They might have a lot to perfect still, and that could be Lunar Lake.
If Intel is going to see a significant increase in battery life, it will come with Lunar Lake or not at all. I doubt Meteor Lake will provide a significant improvement.
 
Reactions: Joe NYC

A///

Diamond Member
Feb 24, 2017
4,352
3,155
136
Meteor is supposed to bring great performance according to gelsinger gunslinger. don't recall battery performance being brought up.
 

nicalandia

Diamond Member
Jan 10, 2019
3,331
5,282
136
Meteor is supposed to bring great performance according to gelsinger gunslinger. don't recall battery performance being brought up.
The last leak posted by YuuKi_Ans would indicate a 12-15% performance boost vs Raptor Cove, I suspect that is 10% IPC + 5 speed on Lion Cove cores(being conserbative, it could 8 IPC 7% core speed)

 
Last edited:

Markfw

Moderator Emeritus, Elite Member
May 16, 2002
25,741
14,773
136
The last leak posted by YuuKi_Ans would indicate a 12-15% performance boost vs Raptor Cove, I suspect that is 10% IPC + 5 speed on Lion Cove cores(being conserbative, it could 8 IPC 7% core speed)

View attachment 78776
OK, is it me or is there nothing to touch Genoa (which is already out, I have one building, 9654, 96 core, 12 channel memory). What is Intel thinking ?
 
Reactions: Joe NYC

nicalandia

Diamond Member
Jan 10, 2019
3,331
5,282
136
OK, is it me or is there nothing to touch Genoa (which is already out, I have one building, 9654, 96 core, 12 channel memory). What is Intel thinking ?
Intel will not be able to Match Genoa in the next 2 years, Granite Rapids is a 2022 product that will be release 2024. Itel Server CPUs have been delayed(thanks to Sapphire Rapids) for two years, Sapphire Rapids was scheduled to be released right after Rome and before Milan, Emerald Rapids was to be a direct competitor to Milan/Milan-X and Granite Rapids/Sierra Forest a competitor to Genoa/Bergamo. That's just not feasable any more, they just cant expedite Granite Rapids release
 

Markfw

Moderator Emeritus, Elite Member
May 16, 2002
25,741
14,773
136
Intel will not be able to Match Genoa in the next 2 years, Granite Rapids is a 2022 product that will be release 2024. Itel Server CPUs have been delayed(thanks to Sapphire Rapids) for two years, Sapphire Rapids was scheduled to be released right after Rome and before Milan, Emerald Rapids was to be a direct competitor to Milan/Milan-X and Granite Rapids/Sierra Forest a competitor to Genoa/Bergamo. That's just not feasable any more, they just cant expedite Granite Rapids release
But I mean granite rapids does not seem to compete with Genoa on any level. Or I am misreading this leak ??
 

Markfw

Moderator Emeritus, Elite Member
May 16, 2002
25,741
14,773
136
Do you think 2X SPR performance is not enough to beat Genoa?
I have not seen enough leaks to believe that, no. Show me some please. SPR is so bad from what I have seem that I don't think so. And AMD is not standing still either.

Edit: the only leak I have seen is that 13900k beats the 2495x, and maybe even the 3495x Xeon. This looks pitiful.
 

A///

Diamond Member
Feb 24, 2017
4,352
3,155
136
The last leak posted by YuuKi_Ans would indicate a 12-15% performance boost vs Raptor Cove, I suspect that is 10% IPC + 5 speed on Lion Cove cores(being conserbative, it could 8 IPC 7% core speed)

View attachment 78776
Mind telling me where i'm supposed to look on a granite rapids leak sheet? Although this may be the first time someone's relied on aggregate performance as fact... lol
 

A///

Diamond Member
Feb 24, 2017
4,352
3,155
136
OK, is it me or is there nothing to touch Genoa (which is already out, I have one building, 9654, 96 core, 12 channel memory). What is Intel thinking ?
They have outstanding contracts so there are customers buying this junk. A lot of this was supposed to come out a while back regardless of whatever bs pushed out that it's actually on time. Intel and their partners likely have a kill fee attached to the contract. Could cost Intel hundreds of millions if they don't deliver.
 

A///

Diamond Member
Feb 24, 2017
4,352
3,155
136
Explain that estimation please?
It's aggregate performance. Pure speculation based on frequency to core count among other factors. It's as good as pulling random stats out of your behind. It's used professionally for a really jank estimate of what something may perform like. If the figures were remotely true Intel's desktop would be dead in the water again for years to come given what AMD wants to do.
 

Geddagod

Golden Member
Dec 28, 2021
1,205
1,172
106
I have not seen enough leaks to believe that, no. Show me some please. SPR is so bad from what I have seem that I don't think so. And AMD is not standing still either.

Edit: the only leak I have seen is that 13900k beats the 2495x, and maybe even the 3495x Xeon. This looks pitiful.
Literally on the leak you were quoting, it says Granite Rapids AP, targeting ~2X performance of EMR-64C.
And also I'm pretty sure, at the very least, 2X SPR is enough to beat Genoa.
SPR 56C scores ~65K on CBR23 MT while Genoa scores 115K apparently.
In GB5, 2X the 56C SPR would be 108% of top end Genoa as well.
These are the only MT scores I can find comparing the two. If you can find some that show otherwise, I would be happy to hear them....
 
Reactions: ZGR and Exist50
sale-70-410-exam    | Exam-200-125-pdf    | we-sale-70-410-exam    | hot-sale-70-410-exam    | Latest-exam-700-603-Dumps    | Dumps-98-363-exams-date    | Certs-200-125-date    | Dumps-300-075-exams-date    | hot-sale-book-C8010-726-book    | Hot-Sale-200-310-Exam    | Exam-Description-200-310-dumps?    | hot-sale-book-200-125-book    | Latest-Updated-300-209-Exam    | Dumps-210-260-exams-date    | Download-200-125-Exam-PDF    | Exam-Description-300-101-dumps    | Certs-300-101-date    | Hot-Sale-300-075-Exam    | Latest-exam-200-125-Dumps    | Exam-Description-200-125-dumps    | Latest-Updated-300-075-Exam    | hot-sale-book-210-260-book    | Dumps-200-901-exams-date    | Certs-200-901-date    | Latest-exam-1Z0-062-Dumps    | Hot-Sale-1Z0-062-Exam    | Certs-CSSLP-date    | 100%-Pass-70-383-Exams    | Latest-JN0-360-real-exam-questions    | 100%-Pass-4A0-100-Real-Exam-Questions    | Dumps-300-135-exams-date    | Passed-200-105-Tech-Exams    | Latest-Updated-200-310-Exam    | Download-300-070-Exam-PDF    | Hot-Sale-JN0-360-Exam    | 100%-Pass-JN0-360-Exams    | 100%-Pass-JN0-360-Real-Exam-Questions    | Dumps-JN0-360-exams-date    | Exam-Description-1Z0-876-dumps    | Latest-exam-1Z0-876-Dumps    | Dumps-HPE0-Y53-exams-date    | 2017-Latest-HPE0-Y53-Exam    | 100%-Pass-HPE0-Y53-Real-Exam-Questions    | Pass-4A0-100-Exam    | Latest-4A0-100-Questions    | Dumps-98-365-exams-date    | 2017-Latest-98-365-Exam    | 100%-Pass-VCS-254-Exams    | 2017-Latest-VCS-273-Exam    | Dumps-200-355-exams-date    | 2017-Latest-300-320-Exam    | Pass-300-101-Exam    | 100%-Pass-300-115-Exams    |
http://www.portvapes.co.uk/    | http://www.portvapes.co.uk/    |