- Sep 10, 2008
- 1,500
- 2
- 81
http://www.xbitlabs.com/news/cpu/di...ure_Peculiarities_to_Software_Developers.html
AMD has a rather strong and clear roadmap for the period of the following three years with the aim to increase performance-per-watt of its high-performance cores by approximately 10% - 15% every year. In practice, this transforms into 33% - 52% speed boost of Excavator micro-architecture compared to Bulldozer. Technologically, AMD wants to improve IPC (instructions per clock) performance and reduce power consumption at the same time, which transforms into higher clock-speeds.
WTH????
So what they are saying is essentially that Piledriver will basically finally catch up to its older phenom 2 /Thuban architecture performance level LOL . So basically Piledriver will be a Phenom 2 level cpu am I wrong???. Also what Im understanding is that in 3 years time AMD will be at the same IPC and performance as what intel is today in 2012 (Before Ivy Bridge) which will bring even better performance. Tell me Im wrong about this , please tell me they are joking. Isnt the Gap to great too stay in the game at this point??? One thing I do see as a positive is that I see alot of free motherboard offers from Microcenter and such in the future.
Last edited: