"...only to find a potentially fatal flaw in the building's construction: the original design's welded joints were changed to bolted joints during construction, which were too weak to withstand 70-mile-per-hour (113 km/h) quartering winds. While LeMessurier's original design and load calculations for the special, uniquely designed "chevron" load braces used to support the building were based on welded joints, a labor- and cost-saving change altered the joints to bolted construction after the building's plans were approved."
That dangling crane pales in comparison to the unthinkable.
"...only to find a potentially fatal flaw in the building's construction: the original design's welded joints were changed to bolted joints during construction, which were too weak to withstand 70-mile-per-hour (113 km/h) quartering winds. While LeMessurier's original design and load calculations for the special, uniquely designed "chevron" load braces used to support the building were based on welded joints, a labor- and cost-saving change altered the joints to bolted construction after the building's plans were approved."
That dangling crane pales in comparison to the unthinkable.