- Nov 25, 2005
- 8,390
- 1
- 81
Originally posted by: BassBomb
Originally posted by: sdifox
didn't they drop out of wrc?
usa rally != wrc
Originally posted by: aleckz
800hrs of work(33 days of labor) / 8hr work day = 100 days
But the process was crazy and the roll cage welds were very meticulous. All the body panels were lightened.. pretty in depth stuff.
I would like to drive one of those bad boys.
Originally posted by: halik
Call me stupid, but why don't they just ship a chassis from the factory?