MmmSkyscraper
Diamond Member
- Jul 6, 2004
- 9,475
- 1
- 76
Originally posted by: yllus
A report, eh? Well then. Carry on thread.
Originally posted by: LS20
check is not properly written
his payment is overdue
high bill * late fees = engineer owned
Originally posted by: mugs
Would have been funnier if he wrote the English representation of the formula on the long line, like you're supposed to.
Originally posted by: bonkers325
D?
wait that isnt right...
Originally posted by: BrownTown
Originally posted by: bonkers325
D?
wait that isnt right...
L
Originally posted by: rivan
Originally posted by: mugs
Would have been funnier if he wrote the English representation of the formula on the long line, like you're supposed to.
I wish I were enough of a math geek to be able to even start writing the plain english translation
The sum of two thousandths...
Originally posted by: Krazy4Real
Originally posted by: BrownTown
Originally posted by: bonkers325
D?
wait that isnt right...
L
O
Originally posted by: silverpig
Do you guys know the story that goes along with it?
Gist: Guy gets quote on long distance rate from Verizon at 0.02 cents per minute. He had it clarified and confirmed. Or so he thought. So he goes out of town, uses long distance like crazy, and then gets a bill for 100x more than he figured. They really meant 0.02 dollars, or 2 cents per minute. So there's this big dispute etc, and he sends them a check for 0.02 cents or something like that.