- Mar 10, 2006
- 11,715
- 2,012
- 126
I am curious...for those of you waiting for Summit Ridge to drop, what does the chip need to deliver for you to choose it over a Kaby Lake-S or Broadwell-E?
As fast as my current 4770K @ 4.8GHz (faster in MT of course).
Really? For sure you can get #1, #2 and #3 for sure from intel, maybe from Zen, good luck with 4 and especially with 5.I will tell you this,
I have a Core i7 3770K OverClocked to 4.44GHz since June 2012, that is more than 4 years now.
In order to upgrade my system I want
1. At least 50% or 2x (double will be preferable) more Threads
2. At the same or higher IPC
3. At the same or higher Clocks (default or able to OC)
4. At the same or lower power
5. And at the same or lower price (300 Euros).
I dont care if it is AMD or Intel, I just want it next year since my system will become 5 years old. This charade with Quad Cores + 5-10% higher IPC at the same price for 6 years needs to stop.
Then be ready for disappointing! %40 More IPC than Excavator does mean around Ivy bridge's IPC.
Clustered Multithreading.
No, Multi-level Clustered Multitheading or simply Multistar is the way to go. It is no surprise who got that under patent, *cough*Intel*cough* and is also buying the company that implemented it, *cough*Soft Machines*cough*.You'll be pining for CMT in 2026.