Started seven years ago when I bought a fixer upper
Before move in
Installed new countertop and dishwasher.
Two rooms of carpet
Laminate floor at entry
After move in
Painted windows and trim
Replaced windows(vinyl)
Ceiling fan in bedroom
New furnace and central air
300 ft ceadr fence
Gutted main bath down to the tub, porcelain tile floor and walls
Completely redid kitchen
Upgraded elect panel
Remove blown on ceiling texture whole house, redid with knock down
Repainted interior of house except 2 rooms
Installed above ground swimming pool w/deck
redid brick fireplace, sheetrock and porcelain tile
Covered front concrete porch in, yep, porcelain tile
Changed most elect fixtures
Current project
Removed deck, old concrete patio, my new stamped concrete patio should be installed hopefully by the end of the week
To do
New shed
New siding
New driveway
New garage doors
Gut master bath
Gutters
Roof in about 5 years
Contarctors hired to date
HVAC guy
Floor guy for porcelain in kitchen
Electrician to inspect my kitchen upgrades and panel installation
I will be so bored by the end of next year
edit
Things I forgot
New exterior french door unit
Finished 1/2 basement
New sump pump
landscaping
Before move in
Installed new countertop and dishwasher.
Two rooms of carpet
Laminate floor at entry
After move in
Painted windows and trim
Replaced windows(vinyl)
Ceiling fan in bedroom
New furnace and central air
300 ft ceadr fence
Gutted main bath down to the tub, porcelain tile floor and walls
Completely redid kitchen
Upgraded elect panel
Remove blown on ceiling texture whole house, redid with knock down
Repainted interior of house except 2 rooms
Installed above ground swimming pool w/deck
redid brick fireplace, sheetrock and porcelain tile
Covered front concrete porch in, yep, porcelain tile
Changed most elect fixtures
Current project
Removed deck, old concrete patio, my new stamped concrete patio should be installed hopefully by the end of the week
To do
New shed
New siding
New driveway
New garage doors
Gut master bath
Gutters
Roof in about 5 years
Contarctors hired to date
HVAC guy
Floor guy for porcelain in kitchen
Electrician to inspect my kitchen upgrades and panel installation
I will be so bored by the end of next year
edit
Things I forgot
New exterior french door unit
Finished 1/2 basement
New sump pump
landscaping