- Oct 28, 1999
- 62,403
- 8,199
- 126
So far we have:
- Repainted nearly every wall in the place
- Put in Brazilian cherry hardwood floors in the den
- put in new trim in the den
- put in a new insulated security door from den to garage
Short term plans include:
- rewiring garage and light switches
- new carpet in basement
- install vent fan over masterbath shower
- crown moulding in dining room and master BR
- replacing the rest of the interior doors with 6 panel doors that open and close well
- replacing all "ivory" outlets and switches with a bright white recepticle
- put ceiling fans and rewire several bedrooms so that the light switches actually operate overhead ceiling lights
Long term plans include:
- 1000 sq/ft master suite edition over garage stalls
- New kitchen counters and cabinets
- Tear up 16x24 deck and put in poured patio & hot tub cabana
- brick veneer on bottom half of house and reside the rest
- Repainted nearly every wall in the place
- Put in Brazilian cherry hardwood floors in the den
- put in new trim in the den
- put in a new insulated security door from den to garage
Short term plans include:
- rewiring garage and light switches
- new carpet in basement
- install vent fan over masterbath shower
- crown moulding in dining room and master BR
- replacing the rest of the interior doors with 6 panel doors that open and close well
- replacing all "ivory" outlets and switches with a bright white recepticle
- put ceiling fans and rewire several bedrooms so that the light switches actually operate overhead ceiling lights
Long term plans include:
- 1000 sq/ft master suite edition over garage stalls
- New kitchen counters and cabinets
- Tear up 16x24 deck and put in poured patio & hot tub cabana
- brick veneer on bottom half of house and reside the rest