Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux
Last Update 2 days ago
Total Questions : 86
Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux is stable now with all latest exam questions are added 2 days ago. Incorporating VCS-260 practice exam questions into your study plan is more than just a preparation strategy.
VCS-260 exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through VCS-260 dumps allows you to practice pacing yourself, ensuring that you can complete all Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux practice test within the allotted time frame.
Which service group dependency type supports two applications being online on any system in the cluster?
Which action should an administrator take to avoid single points of failure when making an application highly available?
A multi-tier application has Oracle at the first level and WebSphere at the second level, which depends on the Oracle application. The Oracle and WebSphere service groups are configured in two separate cluster. The administrator wants the following fault behavior:
Which type of dependency must the administrator configure to acquire the desired behavior?
An administrator is attempting to start Veritas Cluster Server (VCS) on a node and receives the following message:
Which two actions can the administrator perform to resolve this problem? (Choose two.)
A cluster configured with disk based I/O fencing has two dedicated high-priority LLT links and one low-priority link over public network interface.
What is the state of the cluster if both high-priority links fail simultaneously?
An administrator wants to place an existing application under high availability control.
Which requirement must be met to place the application under high availability control?
Which action should an administrator perform to ensure the coordination point (CP) service is highly available when adding a CP server into a Veritas Cluster Server environment?
Which command should an administrator perform to transition a resource state from ‘waiting to go online’ to ‘not waiting’ if the operation hangs on a particular resource?
An administrator is evaluating the suitability of an application to be clustered which can failover to another node in the cluster in an event of an application outage using Veritas InfoScale Availability.
Which condition prevents the application from being made highly available?
TESTED 01 Nov 2024
Hi this is Romona Kearns from Holland and I would like to tell you that I passed my exam with the use of exams4sure dumps. I got same questions in my exam that I prepared from your test engine software. I will recommend your site to all my friends for sure.
Our all material is important and it will be handy for you. If you have short time for exam so, we are sure with the use of it you will pass it easily with good marks. If you will not pass so, you could feel free to claim your refund. We will give 100% money back guarantee if our customers will not satisfy with our products.